A time and materials invoice bills the customer for the hours you actually worked and the materials you actually used, instead of one flat price. For a plumber opening a wall to find the leak, or an electrician chasing an old wiring mess, it is often the fairest way to get paid. It only works when the invoice is clear: hours listed by day, materials listed by item, markup on its own line. We built Quotewren so a solo pro can turn a finished job into a clean, branded invoice with a pay link, and then ask for the review while the customer is still happy.
TL;DR
- A time and materials (T&M) invoice has two parts: labor (hours times your hourly rate) and materials (what you paid, plus your markup).
- Use it when you can't know the scope up front, like repairs, troubleshooting and remodel surprises. Use a flat quote when you can.
- Agree on your rate and markup before you pick up a tool. The invoice should never be the first time the customer sees them.
- Log hours and receipts the same day. Vague entries are where most disputes start.
- Send the invoice with a pay link right after the job, then follow up.
Table of Contents
- What a time and materials invoice is
- When T&M makes sense (and when a flat price is better)
- Agree on the terms before you start
- How to figure labor
- How to figure materials and markup
- A worked example: a plumber's T&M invoice
- What to put on a T&M invoice
- Track the job as you go
- Send it, get paid, follow up
- Our view: the invoice is the easy part
- Make your T&M invoice in minutes
- FAQ
- Sources
What a time and materials invoice is
It is a bill built from what really happened on the job. You charge for the time you spent and for the parts you bought. A T&M invoice bills actual hours and the real cost of materials rather than a lump sum, and it is common when the scope is hard to pin down at the start.
The tradeoff is simple. With a flat price, you carry the risk if the job runs long. With T&M, the customer carries more of that risk, so they will look closely at every line. That is why detail matters.
Quote, estimate, invoice: keep them straight
People mix these words up, and it causes fights.
- Estimate: your best guess of the cost. It can change.
- Quote: a price you commit to. For a T&M job, the quote is really your rates plus an expected range.
- Invoice: the bill after the work is done.
- Deposit: money paid up front, often to cover materials. It gets subtracted from the final invoice.
For T&M work, tell the customer "this is an estimate, and you pay for actual time and parts." Then the invoice does not feel like a surprise.
When T&M makes sense (and when a flat price is better)
T&M fits jobs where you can't see the problem yet:
- A plumber chasing a slow leak behind a shower wall.
- An electrician tracing a dead circuit in a 1960s house.
- An HVAC tech diagnosing a system that cycles on and off.
- A handyman doing a punch list of small fixes in one visit.
- A landscaper clearing an overgrown yard where the soil and roots are unknown.
A flat price fits jobs you have done a hundred times: a water heater swap, a standard fan install, a weekly lawn cut, a regular house clean. If you can name the price before you start, quote it. If you can't, use T&M and say so in writing.
We cover how to pick your hourly number in time and materials pricing for solo trades.
Agree on the terms before you start
Most invoice fights are really agreement fights. Before the first hour, settle four things with the customer, in writing (a text or email counts for a small job):
- Your hourly rate. One rate, or a rate for you and a different one for a helper.
- How you charge for materials. At cost, or cost plus a markup, and how much.
- Other charges. Trip charge, minimum call-out, disposal fees.
- A cap, if you offer one. A not-to-exceed clause caps the total cost. If you hit the cap, you stop and talk before going on.
A simple text works: "Rate is $95 an hour, parts at cost plus 20%, $65 trip charge. I'll call you before we pass $800." That one message prevents most arguments.
On larger government contracts, the rules are formal. For example, the USPS states that its T&M labor rates include overhead and profit, and that materials are supplied at cost. Your residential customers will not use that language, but the idea is the same: the labor rate covers your business costs and profit, so keep them in your rate.
How to figure labor
Labor is hours times rate. The hard part is the rate. A rate that only covers your wage leaves you short. It needs to cover your taxes, insurance, truck, tools, software, unpaid time spent driving and quoting, and profit.
If you pay yourself or a helper through payroll, the way you assign those costs to jobs matters. This guide on job costing payroll shows how labor costs get tied to individual jobs, which helps you check that your rate really covers them.
Two habits keep labor clean:
- Log time the same day. Write start time, stop time and what you did. Don't rebuild it from memory on Friday.
- Be specific. "Replaced shutoff valve and tested for leaks, 1.5 hours" beats "plumbing work, 8 hours." Vague labor entries are where most T&M disputes start, while daily entries with task notes give the customer something to check.
Decide how you bill partial hours. Many pros bill in 15-minute or half-hour steps, and set a one-hour minimum. Whatever you pick, put it in your terms.
How to figure materials and markup
Materials are what you bought for this job: pipe, fittings, breakers, wire, filters, mulch, cleaning supplies you used up on a specific job. Keep every receipt. Take a photo of it at the counter.

Why mark up materials? You drive to the supply house, wait in line, carry the stock, and take the risk if a part is wrong. A markup pays for that. Many contractors charge a markup on top of cost. For the tiers many solo pros use, see our guide to materials markup for solo tradespeople.
Two rules keep markup honest:
- Tell the customer the markup before the job.
- Show it as its own line on the invoice, not buried in the part price.
Sales tax rules on parts and labor differ by state, so check with your state's tax agency or your accountant before you set up your invoice lines.
A worked example: a plumber's T&M invoice
Say you fix a leaking kitchen supply line and replace a failing shutoff valve. Your terms are $95 an hour, parts at cost plus 20%, and no trip charge on repeat customers.
| Line | Detail | Amount |
|---|---|---|
| Labor, Mar 4 | Diagnose leak under sink, 1 hr at $95 | $95.00 |
| Labor, Mar 4 | Replace supply line and shutoff valve, test, 2.5 hrs at $95 | $237.50 |
| Materials | Braided supply line, quarter-turn valve, fittings, plumber's tape (receipts attached): $64.20 | $64.20 |
| Markup | 20% on materials | $12.84 |
| Total | $409.54 |
Check the math: 3.5 hours at $95 is $332.50. Parts at $64.20 plus 20% is $77.04. Together, $409.54. Add sales tax if your state requires it on parts.
A customer who reads this can follow every dollar. That is the goal.
What to put on a T&M invoice
A complete T&M invoice carries a unique invoice number, the issue date and due date, your business details, the client's name and billing address, itemized labor, itemized materials with markup as its own line, tax lines, a grand total and payment instructions. For a homeowner, you can skip purchase order numbers. For a property manager or a business, add their PO or work order number, since many companies route bills by it.
Your checklist:
- Your business name, phone, email, and license number if your state requires it on invoices.
- Customer name and job address.
- Invoice number and date.
- Labor lines by day, with a task and hours.
- Materials lines with quantity and price.
- Markup or other charges as separate lines.
- Deposit already paid, if any.
- Total due, due date, and how to pay.
For general layout and tone, our guides on handyman invoicing, HVAC invoicing and cleaning business invoicing show how the same bill looks in different trades.
If you also freelance or sell your time in other ways, this overview of freelancer finance habits covers keeping your money side organized.
Track the job as you go
You don't need fancy gear. You need a habit.
- Start of job: note the time, the address and what the customer asked for.
- During the job: snap photos of the before, the work in progress and the finished job.
- At the supply house: photograph every receipt and write the job name on it.
- End of job: write the stop time and a two-line summary.
- Same day: turn it into an invoice.
If the job changes, say a plumber finds rotted subfloor, stop and tell the customer. Get a yes by text before you continue. That text is your proof that the extra work was approved.
Send it, get paid, follow up
Send the invoice the same day, while the work is fresh. Make paying easy: a pay link beats a mailed check. Put the due date on it. Our guide to invoice terms solo contractors use helps you choose terms such as due on receipt or net 15.
If you want a late fee, state it before the job and on the invoice. Our guide to invoice late fees explains how to set it up fairly. And for jobs where you want payment at the end of the visit, see getting paid on completion.
If the customer questions a charge
Stay calm. Most questions are "what is this line?" Answer with your records:
- Thank them for asking.
- Send your daily notes, photos and receipts.
- Walk through the line that worries them.
- If you made a mistake, fix it fast. That earns trust.
If your hours and receipts are clean, most questions end there.
Our view: the invoice is the easy part
We build for solo operators, and we see the same pattern on every T&M job. The work gets done, the notes live in your head, and the invoice goes out days later, rushed and thin. Then it gets questioned and paid late.
Our approach is to make the finished job the starting point. You make a branded quote, turn the approved work into an invoice, and send it with a pay link. That means fewer steps between "done" and "paid."
The other half is the review. A happy customer on payment day is the best moment to ask for a Google review, and a three-touch SMS request after the job is done keeps you from forgetting. More reviews help new customers find you. We keep it simple on purpose, because a solo pro does not need a system built for a fleet.
jaras
Make your T&M invoice in minutes
Quotewren is quoting, invoicing and automated Google review-request software for solo tradespeople. You can start on the Free plan at $0. The Quotewren plan is $19 per month, and Quotewren Crew is $39 per month. Branded quotes and invoices, integrated pay links and a three-touch SMS review request after job completion are built for owner-operators. Read how to create branded invoices in under 10 minutes, then start at Quotewren.

FAQ
What is a time and materials invoice?
It is a bill for the actual hours you worked and the actual materials you used, plus any markup you agreed on. It replaces a single flat price. It works best when the scope is unclear at the start.
Is a T&M invoice the same as an estimate?
No. An estimate is a guess before the work. An invoice is the bill after it. On a T&M job, give an estimate first, then invoice the real hours and parts. Tell the customer the final number may differ.
How much markup should I put on materials?
There is no single right number. Many contractors choose a percentage that covers their time buying parts and the risk of wrong ones. Pick yours, tell the customer up front, and show it as its own line. Our materials markup guide walks through common tiers.
Can I charge for travel time?
Yes, if you tell the customer first. Many pros use a flat trip charge or a minimum call-out. Put it in your written terms and list it as its own line on the invoice.
Sources
- T&M Invoice: What to Include and How to Get Paid, LegalClarity
- 2-18.7 Time-and-Materials Contracts, USPS Standard Procurement Procedures
- Time and Materials (T&M) Contracts: How They Work, NetSuite
- Job Costing Payroll: How to Assign Labor Costs to Jobs
- Freelancer Finance Productivity, RemoteProfitly
